თარიღი: 2019
Project: Installation and commissioning of water treatment equipment in Coca Cola new factory in Natakhtari.
Project Goals: Improvement of microbiological contamination condition in water; reduction of turbidity for bottled water production, based on Coca Cola’s design scheme.
Project Details: For disinfection a chlorine dosing system has been installed, controlled by flowmeter input. For reduction of turbidity, a three-step water filtration cartridge filters have been delivered and commissioned.