Date: 2021
Project: Extraction and treatment of water to reduce turbidity.
Project Goals: Treatment of mechanically polluted water to standards required by for YTONG.
Project Details: Three step treatment train was selected, initial oxidation and two step mechanical treatment. Together with increase of turbidity in raw water, treatment velocity is automatically adjusted, which ensures high quality of water at the output.