Project image

New Farm: Installation of a Drinking Water Intake System From the Mtkvari River

In 2023, under the agreement with New Farm, VORTEX Water Engineering supplied advanced water filtration and dosing solutions tailored to the company’s operational needs. The delivered equipment included:

  • KROHNE electromagnetic flow sensor (Germany)

  • AO Smith chlorine dosing systems

  • Ultrafiltration systems

  • Additional water treatment components

Our technical team also performed equipment automation, calibration, and full installation, ensuring seamless integration and optimal system performance.