2025 - Our technical team participated in the construction of the "Nakhiduri HPP" hydroelectric power plant. At the node of the headworks of the HPP, they installed automatic flowmeters for the purpose of accounting for the natural runoff of the Khrami River.
2024 - For the purpose of accounting for the water flow in the river, we deployed a radar water meter. Through this device, the quantity of water obtained by the HPP from the river is accounted for.